Hi Everyone,
We are planning to migrate dual stack PI7.30 to SAP PO7.4 and below are the options which we are planning for:
Option 1 :
--->Migrating classical interfaces into ICO using migration tool
--->Splitting Java stack from ABAP stack using the Dual stack split functionality from SAP.
--->After step 2 i believe we have only AEX which will not support BRM and BPM and it can't be a Process Orchestration Package.I have a plan to upgrade AEX to SAP PO.Since AEX will be on separate instance.(I doubt upgrade can be done or not.)
--->After successful migration we have a plan to decommission the ABAP stack.Can we do this?If i choose this option can i save some bucks to my client?
Option 2:
--->Brand new SAP PO 7.4 box
--->Migrating from PI730 dual stack to SAP PO using migration tool
I already tried with option 2 in sandbox and i have migrated few interfaces and it really went well.
I wanted to go for the best option in terms of hardware and software license and cost.We don't have more no of interface so migrating is not a constraint in both cases.We don't have any ccBPM interfaces
--->SLD content in option 1 is not a problem however in option 2 do i need go for SLD synchronization to import content(Product, SWCV,TS and BS) from dual stack to new SAP PO7.4
Please suggest the best option.
Cheers
Pavan